			The renovation of Terminal 2--including Boarding Area D at San Francisco International Airport expanded and transformed the space into a 640,000 square foot, 14-gate domestic terminal for American Airlines and Virgin America.
| OWNER | San Francisco Int'l. Airport | 
| LOCATION | San Francisco | 
| CONTRACT VALUE | $6 MM | 
| SERVICES |      | 
McGuire and Hester contracted with Turner construction to perform general sitework, including: excavation, removal & disposal of contaminated soil, sludge & water, utility locating, backfill & geotextile, grinding, drainage pipes, drainage structures, water distribution, pavement base course, bitumunous pavement, Portland cement concrete pavement, pavement markings, chain link fence & gates, and painting.
Work also included underground work such as: fueling system protective coatings, mechanical work, installation of pipe & fittings, valves, valve pits, and inspection, testing & flushing.

 
				
			