Westborough Middle School Field & Pavement Improvements

The project includes selective demolition and site preparation to support major campus upgrades at Westborough Middle School. Work features a new synthetic turf field, improved stairs and ramps, gates and fencing, asphalt paving enhancements, and the addition of new basketball and pickleball courts. Accessibility improvements are integrated throughout the site, including upgrades to parking areas, restrooms, drinking fountains, and paths of travel—ensuring safer, more inclusive facilities for students and the community.

OWNERSouth San Francisco Unified School District
LOCATIONSouth San Francisco, CA
CONTRACT VALUE$5.8 MM
SERVICES

Enhancing Westborough Middle School

The project encompasses a range of site preparations and protective measures, including coordinating hazardous material abatement alongside a specialized consultant, safeguarding both new and existing asphalt at the main driveway, and maintaining safe traffic control for vehicles, pedestrians, and cyclists throughout construction. Infrastructure upgrades include installing a minimum 3-inch asphalt overlay with strategic digouts and stripping 4–6 inches of topsoil throughout the field area to prepare for new surfacing and drainage work.

Surface enhancements include applying multi-layer Streetbond coatings to play courts and parking areas, and seal coats across courts, pedestrian walkways, and vehicular/fire lanes for a unified, durable finish. The team is also installing root barriers at newly planted trees, new athletic and recreational fixtures—such as soccer goals, a drinking fountain, volleyball and pickleball systems, and backstops—and constructing pedestrian concrete paving (4" PCC over 6" aggregate base) with upgraded drainage using square catch basins and round atrium-style grates.

Additional structural elements include stair slabs over a 6" aggregate base, ramp paving built per design specifications, and flexible basketball systems that accommodate both regulation and youth play. Subgrade beneath the synthetic turf field is stabilized with a 5% quicklime treatment to 12" depth. The scope also includes targeted demolition of the southern stairway to the lower field and removal of all risers—ensuring a cleaner site ready for new construction features.