SFO Transfer Line and Hydrant System

This project at the SFO Airport involves a comprehensive upgrade to both the transfer line and hydrant systems, aiming to enhance functionality and efficiency. The extensive scope of work includes diverse tasks such as demolition, excavation, grading, concrete foundations, concrete and asphalt paving, and the installation of new hydrant and valve pits, along with various piping modifications.

Details

OWNER: San Francisco International Airport

LOCATION: San Francisco, California.

CONTRACT VALUE: $2.2 MM

GENERAL CONTRACTOR: Burns & McDonnell

DURATION: 2.5 Years

COMPLETION: January 2021

Type of Project

Transportation

Services We Provided

Answering The Call

McGuire and Hester provided full emergency response services, including the installation of temporary bypass pumping systems, coordination with City of Davis operations crews, and the removal and replacement of two deep manhole structures. The depth and volume of flow in the trunk mains posed significant safety and logistical challenges, requiring rapid mobilization and adaptive field strategies.

Despite the complexity of the repair, McGuire and Hester crews maintained seamless coordination with city staff to stabilize the system quickly and minimize service disruption. Work was performed on an emergency basis under compressed timelines, with safety and quality at the forefront throughout the process.

Worksite Images

More Projects With Same Services

Prev 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Next
Prev 1 2 3 4 5 6 7 8 9 10 11 Next
Prev 1 2 3 4 5 6 7 8 9 10 11 12 13 Next
Prev 1 2 3 4 5 6 7 8 9 10 11 12 13 Next

More Projects In Similar Markets

SFO Boarding Area A

SFO New Fuel Storage Tanks