Oakland On-Call Citywide Pavement Rehab
Beginning in 2019, the City of Oakland committed to major paving updates throughout the cities streets. The 3-year paving plan incorporates equity, street condition, and safety metrics to prioritize repaving across Oakland. An excerpt from their website states” Safe, well-maintained streets are the foundation of every neighborhood’s local transportation network. They’re vital whether you get around by bus, bike, on foot, in a wheelchair or stroller, or in a car. In the process of repaving Oakland’s streets, Oakland has an opportunity to update newly resurfaced streets with designs that accommodate more users and meet even higher standards for safety and accessibility.”
Details
OWNER: City of Oakland
LOCATION: Oakland, California
CONTRACT VALUE: $13.7 MM
DURATION: 1 Year
Type of Project
Transportation
Services We Provided
Desription
McGuire and Hester contracted with the city to be one of their on-call contractors of choice for any repairs and improvements needed during the 2019 and 2020 calendar year. During this time our crews paved over 30,000 tons of asphalt. This project had its share of challenges. The team worked on dozens of congested Oakland streets, managing the safety of pedestrians, and at times working on narrow hilly roads.
Project Scope: Pavement rehabilitation, pavement reconstruction, base repair, crack sealing, micro-surfacing, speed bump, removal and replacement of concrete sidewalk, removal and replacement of curb and gutter, removal and replacement of concrete ADA ramp (w/truncated dome), installation of concrete ADA ramp (w/truncated dome), removal and replacement of traffic striping, removal and installation of pavement markings, installation of flexible delineators and K-71 marker posts, installation of channelizing curb system, installing modular segregating curb pieces, installing modular loading platform, and all associated work.

Worksite Images
More Projects With Same Services
More Projects In Similar Markets
UPRR 2025 Lathrop IMF Pavement Rehab Project
Rancho Cordova Sunrise Blvd. Rehab
Dixieanne Neighborhood Clean & Green Alleys
SFO Boarding Area A
SFO Transfer Line and Hydrant System
SFO New Fuel Storage Tanks
Alameda County Public Works Patterson Pass Emergency Work
Larkspur Doherty Complete Streets Project
City of Davis L St. Improvements
Mather Airport
Oakland On-Call Citywide Pavement Rehab
Sacramento County Kiefer Landfill
Sacramento Ramona Avenue Extension
San Francisco 5th and Bryant
Port of Oakland Berths 55 & 56
UPRR 29 Span Bridge Replacement
UPRR Intermodal – South Lead
San Jose Airport Techcrete Installation
SFO Hydrant System Repairs
SFO Westfield Cargo
UPRR Lathrop Intermodal
UPRR Bridge Construction
Grass Valley Dorsey Drive Interchange
Oakland 12th St. Reconstruction
SFO Terminal 2 Boarding Area
OIA Tank Farm
Transbay Temporary Terminal
UPRR Donner Pass Tunnel

City of Davis 66-Inch Influent Sewer Slip-lining
California Department of General Services State Printing Plant Demolition