Oakland 12th St. Reconstruction
In an area that had not been redeveloped since the 1950’s, Lake Merritt was transformed by this shoreline renovation project.
Details
OWNER: City of Oakland
LOCATION: Oakland, California
CONTRACT VALUE: $35 MM
Type of Project
Lake Merritt | Transportation
Services We Provided
Desription
The project not only removed an unfriendly and obsolete pedestrian roadway configuration, but enabled the return of the original tidal slough from the lake to the bay with the removal of a long stretch of buried box culvert. Additionally, this major revitalization project added a 3.5 acre civic park that vastly improved pedestrian access around the lake, as well as to nearby Laney College and the Kaiser Convention Center.
The scope for this multi-year project included the removal of 12 lanes of traffic on 3 separate roads for consolidation into a more functional 6 lane boulevard and superstructure. This provided more sensibly configured, signalized intersections and pedestrian interface
The key structure of the project is the new multi-lane vehicular bridge and the separate pedestrian bridge over the new open channel. This project was finished with 4,500 linear feet of rehabilitated lake shoreline, pedestrian paths, architectural concrete, and landscaping throughout, including tidal wetlands restoration.

Worksite Images
More Projects With Same Services
More Projects In Similar Markets
UPRR 2025 Lathrop IMF Pavement Rehab Project
Rancho Cordova Sunrise Blvd. Rehab
Dixieanne Neighborhood Clean & Green Alleys
SFO Boarding Area A
SFO Transfer Line and Hydrant System
SFO New Fuel Storage Tanks
Alameda County Public Works Patterson Pass Emergency Work
Larkspur Doherty Complete Streets Project
City of Davis L St. Improvements
Mather Airport
Oakland On-Call Citywide Pavement Rehab
Sacramento County Kiefer Landfill
Sacramento Ramona Avenue Extension
San Francisco 5th and Bryant
Port of Oakland Berths 55 & 56
UPRR 29 Span Bridge Replacement
UPRR Intermodal – South Lead
San Jose Airport Techcrete Installation
SFO Hydrant System Repairs
SFO Westfield Cargo
UPRR Lathrop Intermodal
UPRR Bridge Construction
Grass Valley Dorsey Drive Interchange
Oakland 12th St. Reconstruction
SFO Terminal 2 Boarding Area
OIA Tank Farm
Transbay Temporary Terminal
UPRR Donner Pass Tunnel

John Muir Medical Center
SFO Terminal 2 Boarding Area