Larkspur Doherty Complete Streets Project
The Doherty Drive Repaving Project will introduce a new roadway that is raised above the current flood levels and includes new Class I and Class II bike routes, sidewalks, and is ADA compliant.
Details
OWNER: City of Larkspur
LOCATION: Larkspur, California.
CONTRACT VALUE: $1.6MM
DURATION: 3 Months
COMPLETION: September 2022
Type of Project
Transportation
Services We Provided
Desription
The overall scope of the project consists of maintenance of the traffic control system and water pollution control program. Our team removed and disposed of curb and gutter, asphalt concrete roadway pavement, existing irrigation, trees and shrubs. We made storm drainage improvements, constructed concrete curb ramps, sidewalk, curb and gutter. Also, we constructed a new retaining wall, installed chain link fence, and placed hot mix asphalt (HMA). Our team removed and replaced traffic striping and markings, installed pavement markers, installed object markers and signs, excavated and installed storm drainage pipe and structures, as well as relocated utilities and motor control center. McGuire and Hester backfilled trenches and installed irrigation and landscaping.
The start of school was the largest challenge on this project. All site improvements to curb ramps, trail and concrete wall needed to be in place prior to the start of school. Our team completed the majority of the scope of work in under 2 months, just in time for the beginning of the school year.
Worksite Images
More Projects With Same Services
More Projects In Similar Markets
UPRR 2025 Lathrop IMF Pavement Rehab Project
Rancho Cordova Sunrise Blvd. Rehab
Dixieanne Neighborhood Clean & Green Alleys
SFO Boarding Area A
SFO Transfer Line and Hydrant System
SFO New Fuel Storage Tanks
Alameda County Public Works Patterson Pass Emergency Work
Larkspur Doherty Complete Streets Project
City of Davis L St. Improvements
Mather Airport
Oakland On-Call Citywide Pavement Rehab
Sacramento County Kiefer Landfill
Sacramento Ramona Avenue Extension
San Francisco 5th and Bryant
Port of Oakland Berths 55 & 56
UPRR 29 Span Bridge Replacement
UPRR Intermodal – South Lead
San Jose Airport Techcrete Installation
SFO Hydrant System Repairs
SFO Westfield Cargo
UPRR Lathrop Intermodal
UPRR Bridge Construction
Grass Valley Dorsey Drive Interchange
Oakland 12th St. Reconstruction
SFO Terminal 2 Boarding Area
OIA Tank Farm
Transbay Temporary Terminal
UPRR Donner Pass Tunnel

Venitia Valley Middle School Track and Field
Hale Creek Pilot Enhancement Project