
John Muir Medical Center
From the construction of the temporary parking lot in 2007 to the grand opening in 2011, McGuire and Hester was on-site from the start.
Details
OWNER: Clark Construction
LOCATION: Walnut Creek, California
CONTRACT VALUE: $16.1 MM
Type of Project
Healthcare
Services We Provided
Desription
Working for several different clients, we participated in the installation of a temporary helipad, new multi-level parking structure, existing lot demolition, emergency room access site work, mass ex and utilities, central utility plant, a 20,000 gallon fuel tank as part of the OSHPD requirements, structural walls for the underground loading dock, site utilities, and provided continued support for hospital expansion infrastructure.
This long term heavy lifting culminated with the installation of the architectural and landscape finishes. This Gates + Associates design included, architectural concrete paving and walls, stone masonry paving and granite block bollards. Opposite the main entry, a 200 foot ‘mountain range’ sculpture of steel and glass framed the drop off area. Facing the main entry along the ‘River of Light’ axis, a fountain was constructed of split boulders and masonry coping.
Thousands of shrubs and trees adorned the project and were accented by trellises, benches and other furnishings inviting you to relax.

Worksite Images
More Projects With Same Services
More Projects In Similar Markets
UCSF Health Helen Diller Hospital
Cathedral Hill Hospital Temporary Power
Yountville Skilled Nursing Facility Memory Care
Kaiser Interim Open Space
Cathedral Hill Pedestrian Tunnel
San Jose Regional Medical Center
Vacaville Kaiser Helipad
Highland Hospital Acute Tower
PAMF Medical Center
John Muir Medical Center

Bing Concert Hall
Oakland 12th St. Reconstruction
