Dixieanne Neighborhood Clean & Green Alleys
McGuire and Hester revitalized five alleyways in the Dixieanne Neighborhood, transforming deteriorated infrastructure into a sustainable, functional asset for the community. The scope of work included full demolition of existing alleyways, installation of new underground storm drain infrastructure, and construction of an environmentally conscious pervious paver drainage system. These improvements were aimed at enhancing water management while upgrading aging public space assets.
Details
OWNER: City of Sacramento
LOCATION: Sacramento, California.
CONTRACT VALUE: $3.8 MM
COMPLETION: January 2025
DURATION: 5 Months
COMPLETION: November 2024
Type of Project
Transportation
Services We Provided
Reclaiming Community Spaces
The project began with the demolition of five deteriorated alleyways, followed by the installation of a new underground storm drain system. A pervious paver drainage solution was introduced to reduce surface runoff and promote on-site infiltration. Together, these improvements help manage stormwater more efficiently while improving the safety and longevity of the alleyways.
Since the alleys serve as active access points for residents, maintaining use during construction was a critical priority. McGuire and Hester carefully phased the work to ensure minimal disruption while also addressing unexpected conditions, including the discovery of undocumented utilities. The team’s ability to adapt quickly and resolve issues in the field helped keep the project moving forward without delay.
This revitalization effort significantly improved both the function and appearance of the alleys. What were once deteriorated and inefficient spaces now offer cleaner, safer, and more accessible pathways for residents. The upgrades contribute to neighborhood pride while also improving overall stormwater performance.
McGuire and Hester brought in-house capabilities in demolition, grading, pipeline installation, and concrete work to deliver a seamless and coordinated effort. The team’s proactive communication, field experience, and ability to stay ahead of schedule added measurable value to this community-focused improvement project.
Worksite Images
More Projects With Same Services
More Projects In Similar Markets
UPRR 2025 Lathrop IMF Pavement Rehab Project
Rancho Cordova Sunrise Blvd. Rehab
Dixieanne Neighborhood Clean & Green Alleys
SFO Boarding Area A
SFO Transfer Line and Hydrant System
SFO New Fuel Storage Tanks
Alameda County Public Works Patterson Pass Emergency Work
Larkspur Doherty Complete Streets Project
City of Davis L St. Improvements
Mather Airport
Oakland On-Call Citywide Pavement Rehab
Sacramento County Kiefer Landfill
Sacramento Ramona Avenue Extension
San Francisco 5th and Bryant
Port of Oakland Berths 55 & 56
UPRR 29 Span Bridge Replacement
UPRR Intermodal – South Lead
San Jose Airport Techcrete Installation
SFO Hydrant System Repairs
SFO Westfield Cargo
UPRR Lathrop Intermodal
UPRR Bridge Construction
Grass Valley Dorsey Drive Interchange
Oakland 12th St. Reconstruction
SFO Terminal 2 Boarding Area
OIA Tank Farm
Transbay Temporary Terminal
UPRR Donner Pass Tunnel

Harbor Bay Trail Emergency Project
Oakland Roots SC: Coliseum Field Conversion