City of Davis Sewer Main Emergency Project
Over Presidents Day weekend, McGuire and Hester responded to an urgent call from the City of Davis regarding a failed manhole. The situation rapidly escalated into a critical emergency repair involving two failed manholes on the city’s 21-inch and 48-inch trunk sewer mains. With flows active and depths exceeding 20 feet, immediate intervention was required to prevent system failure.
Details
OWNER: City of Davis
LOCATION: Davis, California.
CONTRACT VALUE: $1.6 MM
DURATION: 2 Months
COMPLETION: April 2025
Type of Project
Public Utilities
Services We Provided
Answering The Call
McGuire and Hester provided full emergency response services, including the installation of temporary bypass pumping systems, coordination with City of Davis operations crews, and the removal and replacement of two deep manhole structures. The depth and volume of flow in the trunk mains posed significant safety and logistical challenges, requiring rapid mobilization and adaptive field strategies.
Despite the complexity of the repair, McGuire and Hester crews maintained seamless coordination with city staff to stabilize the system quickly and minimize service disruption. Work was performed on an emergency basis under compressed timelines, with safety and quality at the forefront throughout the process.

Worksite Images
More Projects With Same Services
More Projects In Similar Markets
City of Davis Sewer Main Emergency Project
Natomas Reach A Levee Improvements
Woodland Davis Clean Water Agency Water Main Repair
Placerville Lennar Homes Microtunneling Project
Oakland Zoo Emergency Project
Hale Creek Pilot Enhancement Project
City of Davis Sewer Lift Station #3
City Of Davis Emergency Waterline Repair
City of Davis 66-Inch Influent Sewer Slip-lining
Presidio Tunnel Tops Landscape
Sacramento Water Meter Retrofits
City of Folsom Willow Hill Pipeline Rehabilitation Phase 2
Sacramento 9th Street Sewer Improvement
Newark Twin Force Main Relocation
Olympic Pump Station & Force Main
Noble Gulch Trunkline
City of Palo Alto Reclaimed Water Pipeline
Storm Drain Outfall & Treatment Pond Pacific Commons
Alameda County Water District Large Diameter Pipeline
Livermore-Amador Valley Water Management Agency Wetland Restoration
DSRSD Recyled Water Expansion Phase I
Moraga Sinkhole & Storm Drain

Rancho Cordova Sunrise Blvd. Rehab
Buchanan Street Mall