Anderson Elementary Synthetic Turf Field

The Hale Creek Pilot project is a model project that takes a natural approach to flood control and protection. The unique methods used on this site could serve as a model for restoring other concrete channels.

Details

OWNER: Moreland School District

CONTRACT VALUE: $656k

DURATION: 6 Months

COMPLETION: February 2023

 

Type of Project

Education

Services We Provided

Desription

This project was to build a large multi-purpose synthetic sports field and a small adjacent natural grass field at Anderson Elementary School who also shared the field with an adjacent Charter School. There was also a new asphalt paved walkway that went around both fields. The fields and pathways had concrete bands as borders. The large synthetic field had a subdrain system that we installed as well. This job was self-performed for the most part with only the tree demo and new fence installed by subcontractors. We also installed a small section of decomposed granite for kids to play on. The project involved all aspects of what M&H performs, grading, asphalt paving, concrete flatwork, underground utilities and irrigation/landscaping.

Worksite Images

More Projects With Same Services

Prev 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Next
Prev 1 2 3 4 5 6 7 8 9 10 11 Next
Prev 1 2 3 4 5 6 7 8 9 10 11 Next

More Projects In Similar Markets

Hale Creek Pilot Enhancement Project

Vista Del Lago Stadium Bleachers and Field House