Description
The Olympic Pump Station in the city of San Bruno is designed to meet current health and safety standards, improve reliability of the City’s sewer system and eliminate sanitary sewer overflows.
McGuire and Hester’s work included the demolition of the existing pump station, sewage pump station, and sewer force main. In addition, all building, paving, grading and landscape work was completed by McGuire and Hester crews.

Worksite Images
More Projects With Same Services
Prev
1
2
3
4
5
6
7
8
9
10
11
12
13
Next
Prev
1
2
3
Next
Prev
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Next
More Projects In Similar Markets
Public Utilities
City of Davis Sewer Main Emergency Project
Public Utilities
Natomas Reach A Levee Improvements
Public Utilities
Woodland Davis Clean Water Agency Water Main Repair
Public Utilities
Placerville Lennar Homes Microtunneling Project
Public Utilities
Oakland Zoo Emergency Project
Public Utilities
Hale Creek Pilot Enhancement Project
Public Utilities
City of Davis Sewer Lift Station #3
Public Utilities
City Of Davis Emergency Waterline Repair
Public Utilities
City of Davis 66-Inch Influent Sewer Slip-lining
Public Utilities
Presidio Tunnel Tops Landscape
Public Utilities
Sacramento Water Meter Retrofits
Public Utilities
City of Folsom Willow Hill Pipeline Rehabilitation Phase 2
Public Utilities
Sacramento 9th Street Sewer Improvement
Public Utilities, Residential and Lodging
Newark Twin Force Main Relocation
Public Utilities
Olympic Pump Station & Force Main
Public Utilities
Noble Gulch Trunkline
Public Utilities
City of Palo Alto Reclaimed Water Pipeline
Public Utilities
Storm Drain Outfall & Treatment Pond Pacific Commons
Public Utilities
Alameda County Water District Large Diameter Pipeline
Public Utilities
Livermore-Amador Valley Water Management Agency Wetland Restoration
Public Utilities
DSRSD Recyled Water Expansion Phase I
Public Utilities
Moraga Sinkhole & Storm Drain
Prev
1
2
3
4
5
Next

UPRR Intermodal – South Lead
Noble Gulch Trunkline
