Noble Gulch Trunkline
This project is part of an ongoing and consistent effort by Santa Cruz County Sanitation District to prioritize and improve old and inadequate sewage infrastructure in areas where beach water quality is a concern.
Details
OWNER: Santa Cruz Sanitation DIstrict
LOCATION: Santa Cruz, California
CONTRACT VALUE: $9.5 MM
AWARDS: 2016 APWA Award of Merit
Type of Project
Public Utilities
Services We Provided
Description
M&H crews will be sealing off the existing leaky sewer line while constructing approx, 7,000 LF of new open cut sewer, 51 new sewer manholes, construction 5 Microtunneling pits up to 43’ deep to facilitate 1,800 LF of Microtunneling and 850 LF of Directional Drilling.
In effort to minimize impacts to local highways and landfills, McGuire and Hester processed 4,000 CY of excavated soils creating “soil cement” utilized for backfill of trenches and tunneling pits.

Worksite Images
More Projects With Same Services
More Projects In Similar Markets
City of Davis Sewer Main Emergency Project
Natomas Reach A Levee Improvements
Woodland Davis Clean Water Agency Water Main Repair
Placerville Lennar Homes Microtunneling Project
Oakland Zoo Emergency Project
Hale Creek Pilot Enhancement Project
City of Davis Sewer Lift Station #3
City Of Davis Emergency Waterline Repair
City of Davis 66-Inch Influent Sewer Slip-lining
Presidio Tunnel Tops Landscape
Sacramento Water Meter Retrofits
City of Folsom Willow Hill Pipeline Rehabilitation Phase 2
Sacramento 9th Street Sewer Improvement
Newark Twin Force Main Relocation
Olympic Pump Station & Force Main
Noble Gulch Trunkline
City of Palo Alto Reclaimed Water Pipeline
Storm Drain Outfall & Treatment Pond Pacific Commons
Alameda County Water District Large Diameter Pipeline
Livermore-Amador Valley Water Management Agency Wetland Restoration
DSRSD Recyled Water Expansion Phase I
Moraga Sinkhole & Storm Drain

Olympic Pump Station & Force Main
Kaiser Interim Open Space