Hale Creek Pilot Enhancement Project
The Hale Creek Pilot project is a model project that takes a natural approach to flood control and protection. The unique methods used on this site could serve as a model for restoring other concrete channels.
Details
OWNER: Santa Clara Valley Water District
LOCATION: Mountain View, California.
CONTRACT VALUE: $6.4MM
Type of Project
Public Utilities
Services We Provided
Desription
In response to repeated and large-scale floods through the 1950s, the Santa Clara Valley Water District (District) constructed many miles of flood protection projects, including concrete-lined channels. Many of these channels are now well over 50 years old and are reaching the end of their life cycle. Most agencies now refrain from using hardscape flood protection solutions because newer methods and alternative solutions exist. Rather than simply replacing these channels, this project took a natural approach to flood protection. These methods included flood retention, stream restoration, and multi-stage earth-lined, vegetated channels. If successful, this pilot project will serve as a model for restoring other South Bay concrete channels facing similar issues.
McGuire and Hester Crews removed approximately 650 feet of existing concrete trapezoidal channel lining on Hale Creek from upstream in the City of Mountain View to downstream in the City of Los Alto. Once removed, it was replaced with a vegetated earth channel, including hardened outside retaining walls.
This work provides the following benefits:
- Widened the flood-prone area available to the stream
- Restored the natural channel bank and inverted lining
- Allowed natural stream recharge
- Reduced the channel slope
- Restored channel meander
- Permitted meander development into the future
- Lowered the one-percent and lower flood event water surface elevations.
Additionally, crews removed a 30×15-footbridge and replaced it with a new 30×12-foot prefabricated steel bridge to span between the east and west banks slightly downstream of the previous bridge.

Worksite Images
More Projects With Same Services
More Projects In Similar Markets
City of Davis Sewer Main Emergency Project
Natomas Reach A Levee Improvements
Woodland Davis Clean Water Agency Water Main Repair
Placerville Lennar Homes Microtunneling Project
Oakland Zoo Emergency Project
Hale Creek Pilot Enhancement Project
City of Davis Sewer Lift Station #3
City Of Davis Emergency Waterline Repair
City of Davis 66-Inch Influent Sewer Slip-lining
Presidio Tunnel Tops Landscape
Sacramento Water Meter Retrofits
City of Folsom Willow Hill Pipeline Rehabilitation Phase 2
Sacramento 9th Street Sewer Improvement
Newark Twin Force Main Relocation
Olympic Pump Station & Force Main
Noble Gulch Trunkline
City of Palo Alto Reclaimed Water Pipeline
Storm Drain Outfall & Treatment Pond Pacific Commons
Alameda County Water District Large Diameter Pipeline
Livermore-Amador Valley Water Management Agency Wetland Restoration
DSRSD Recyled Water Expansion Phase I
Moraga Sinkhole & Storm Drain

Larkspur Doherty Complete Streets Project
Anderson Elementary Synthetic Turf Field