Woodland Davis Clean Water Agency Water Main Repair
The new UCSF Health Helen Diller Hospital represents a significant stride in realizing UCSF’s vision for a cutting-edge medical center catering to the increased need in healthcare for the San Francisco Bay Area. By 2030, the expansion plan aims to bolster the overall bed capacity from 475 to 682.
Details
OWNER: West Yost Associates
LOCATION: Woodland, California.
CONTRACT VALUE: $166K
DURATION: 3 Weeks
COMPLETION: April 2023
Type of Project
Public Utilities
Services We Provided
Desription
The City of Davis and UC Davis depend on this transmission main as their primary water supply. While we performed the work residents were required to use a well system with storage tanks. The project was to be completed in an aggressive five-day period to restore access to the main water supply. It took three days to disinfect the 5,800 LF pipeline, and while that took up most of our schedule, crews worked quickly and efficiently to remove a damaged piece of 30″ welded steel pipe and installed a new 30″ x 24″ access port and 72″ manhole. As a result, the City and all residents have restored access to a reliable and healthy water supply.
Worksite Images
More Projects With Same Services
More Projects In Similar Markets
City of Davis Sewer Main Emergency Project
Natomas Reach A Levee Improvements
Woodland Davis Clean Water Agency Water Main Repair
Placerville Lennar Homes Microtunneling Project
Oakland Zoo Emergency Project
Hale Creek Pilot Enhancement Project
City of Davis Sewer Lift Station #3
City Of Davis Emergency Waterline Repair
City of Davis 66-Inch Influent Sewer Slip-lining
Presidio Tunnel Tops Landscape
Sacramento Water Meter Retrofits
City of Folsom Willow Hill Pipeline Rehabilitation Phase 2
Sacramento 9th Street Sewer Improvement
Newark Twin Force Main Relocation
Olympic Pump Station & Force Main
Noble Gulch Trunkline
City of Palo Alto Reclaimed Water Pipeline
Storm Drain Outfall & Treatment Pond Pacific Commons
Alameda County Water District Large Diameter Pipeline
Livermore-Amador Valley Water Management Agency Wetland Restoration
DSRSD Recyled Water Expansion Phase I
Moraga Sinkhole & Storm Drain

UCSF Health Helen Diller Hospital
Alameda County Public Works Patterson Pass Emergency Work