SFO Boarding Area A
This project encompasses a comprehensive overhaul within Boarding Area A, aimed at enhancing the flexibility of aircraft parking and optimizing associated infrastructure. The focal points include the replacement of existing passenger boarding bridges, apron improvements, upgrades to the hydrant fueling system, installation of new fixed bridges, door penetrations, and necessary enhancements to building systems and other critical infrastructure.
Details
OWNER: San Francisco International Airport
LOCATION: San Francisco, California.
CONTRACT VALUE: $24.7 MM
GENERAL CONTRACTOR: Skanska
DURATION: 16 Months
COMPLETION: October 2020
Type of Project
Transportation
Services We Provided
Revitalizing Boarding Area A: A Comprehensive Overhaul for Enhanced Aircraft Flexibility
The Scope of Work is extensive and involves various key components. This includes the construction of new hydrant pits, the modification of existing hydrant pits to high point vents, and the removal of outdated hydrants. The also involves the removal and replacement of 29 concrete passenger boarding bridge foundations at Boarding Area A gates, coring, and installation of 300 8″ diameter concrete-filled bollards throughout the area, and the replacement of 138 concrete apron pavement slabs at all Boarding Area A Gates.
Additionally, the project required the installation and rerouting of storm drain and sewer lines to accommodate a new bus annex, the modification of four jet fuel hydrant pits, and extensive excavation work to align with revised aircraft envelopes and positioning at two gates. This involved removing existing hydrant pits, extending lateral lines, and installing new hydrant pits.
Our crews also replaced two existing hydrant heads with high point vent assemblies and addressing infrastructure needs at live taxiways. This included the removal of existing concrete apron paving at two engine start-up pads and the removal and replacement of 12,000 tons of asphalt paving in the existing taxiway. These measures collectively contribute to the overall efficiency, safety, and adaptability of aircraft operations within Boarding Area A.

Worksite Images
More Projects With Same Services
More Projects In Similar Markets
UPRR 2025 Lathrop IMF Pavement Rehab Project
Rancho Cordova Sunrise Blvd. Rehab
Dixieanne Neighborhood Clean & Green Alleys
SFO Boarding Area A
SFO Transfer Line and Hydrant System
SFO New Fuel Storage Tanks
Alameda County Public Works Patterson Pass Emergency Work
Larkspur Doherty Complete Streets Project
City of Davis L St. Improvements
Mather Airport
Oakland On-Call Citywide Pavement Rehab
Sacramento County Kiefer Landfill
Sacramento Ramona Avenue Extension
San Francisco 5th and Bryant
Port of Oakland Berths 55 & 56
UPRR 29 Span Bridge Replacement
UPRR Intermodal – South Lead
San Jose Airport Techcrete Installation
SFO Hydrant System Repairs
SFO Westfield Cargo
UPRR Lathrop Intermodal
UPRR Bridge Construction
Grass Valley Dorsey Drive Interchange
Oakland 12th St. Reconstruction
SFO Terminal 2 Boarding Area
OIA Tank Farm
Transbay Temporary Terminal
UPRR Donner Pass Tunnel

UPRR 2025 Lathrop IMF Pavement Rehab Project
SFO Transfer Line and Hydrant System