McGuire and Hester partnered with the Oakland Zoo to repair a key pedestrian pathway near the chimpanzee exhibit—an area heavily traveled by visitors and a main viewing location. The work was carefully timed to align with a planned shutdown of the zoo’s gondola system, minimizing disruption while a large section of the upper zoo was temporarily closed to the public.

Details

OWNER: Oakland Zoo

LOCATION: Oakland, California.

CONTRACT VALUE: $405K

DURATION: 2 Days

COMPLETION: February 2025

Type of Project

Commercial

Services We Provided

Paving the Way at the Oakland Zoo

Crews removed approximately 4,500 square feet of existing asphalt, fine-graded the subgrade, and installed 3 inches of new hot mix asphalt, totaling about 80 tons. An additional 40 feet of new asphalt berm was also added to improve drainage and path definition. Despite limited access and time constraints, the team completed the work in just two days. While on site, McGuire and Hester also addressed several predetermined repair areas at the zoo’s request, helping to eliminate tripping hazards and enhance the overall visitor experience.

Worksite Images

More Projects With Same Services

Prev 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Next
Prev 1 2 3 4 5 6 7 8 9 10 11 Next

More Projects In Similar Markets

Natomas Reach A Levee Improvements

Harbor Bay Trail Emergency Project