Natomas Reach A Levee Improvements
McGuire and Hester is supporting critical flood control and infrastructure upgrades for the Natomas Reach A Levee Improvements project in Sacramento. This effort is part of a broader U.S. Army Corps of Engineers initiative to enhance long-term flood protection for the Natomas Basin, a region historically vulnerable to catastrophic flooding. Our team is delivering complex utility relocations, drainage improvements, and mechanical upgrades that strengthen public safety and regional infrastructure resilience.
Details
OWNER: USACE Sacramento District
LOCATION: Natomas, California.
CONTRACT VALUE: $15.7 MM
GENERAL CONTRACTOR: Forgen
COMPLETION: April 2025
Type of Project
Public Utilities
Services We Provided
Reinforcing Resilience in the Natomas Basin
McGuire and Hester is delivering critical utility and drainage improvements as part of the Natomas Reach A Levee Improvements project in Sacramento. Working alongside FORGEN and the U.S. Army Corps of Engineers, the team is relocating sewer and water mains, installing bypass systems, and upgrading key infrastructure at Pump Plant 1B and City Sump 160. Construction is taking place along an active levee, requiring tight coordination, phased access, and careful sequencing to ensure service continuity and regulatory compliance. McGuire and Hester collaborated with FORGEN, the Army Corps, and Reclamation District 1000 (RD 1000) to address unforeseen conditions that necessitated a 100 cubic feet per second (CFS) bypass for stormwater drainage during the pump replacement. This crucial bypass system, not initially part of the project scope, was successfully proposed and integrated as a change order, demonstrating McGuire and Hester’s ability to provide a constructible and cost-effective solution to maintain acceptable stormwater runoff levels throughout the pump replacement.
The project is being completed under rigorous environmental oversight, with erosion control, stormwater protection, and wildlife safeguards in place to protect nearby habitat areas. McGuire and Hester is also focused on minimizing disruptions to surrounding neighborhoods by maintaining access, controlling dust and noise, and coordinating closely with city partners. Once complete, these improvements will provide long-term flood protection for the Natomas Basin, significantly reducing risk for tens of thousands of residents while strengthening the region’s core infrastructure.

Worksite Images
More Projects With Same Services
More Projects In Similar Markets
City of Davis Sewer Main Emergency Project
Natomas Reach A Levee Improvements
Woodland Davis Clean Water Agency Water Main Repair
Placerville Lennar Homes Microtunneling Project
Oakland Zoo Emergency Project
Hale Creek Pilot Enhancement Project
City of Davis Sewer Lift Station #3
City Of Davis Emergency Waterline Repair
City of Davis 66-Inch Influent Sewer Slip-lining
Presidio Tunnel Tops Landscape
Sacramento Water Meter Retrofits
City of Folsom Willow Hill Pipeline Rehabilitation Phase 2
Sacramento 9th Street Sewer Improvement
Newark Twin Force Main Relocation
Olympic Pump Station & Force Main
Noble Gulch Trunkline
City of Palo Alto Reclaimed Water Pipeline
Storm Drain Outfall & Treatment Pond Pacific Commons
Alameda County Water District Large Diameter Pipeline
Livermore-Amador Valley Water Management Agency Wetland Restoration
DSRSD Recyled Water Expansion Phase I
Moraga Sinkhole & Storm Drain

Buchanan Street Mall
Oakland Zoo Pathway Paving