SFO Terminal 2 Boarding Area D

sf  International Airport

$6 MM

The renovation of Terminal 2--including Boarding Area D at San Francisco International Airport expanded and transformed the space into a 640,000 square foot, 14-gate domestic terminal for American Airlines and Virgin America. McGuire and Hester contracted with Turner construction to perform general sitework, including: excavation, removal & disposal of contaminated soil, sludge & water, utility locating, backfill & geotextile, grinding, drainage pipes, drainage structures, water distribution, pavement base course, bitumunous pavement, Portland cement concrete pavement, pavement markings, chain link fence & gates, and painting. Work also included underground work such as: fueling system protective coatings, mechanical work, installation of pipe & fittings, valves, valve pits, and inspection, testing & flushing.

 

Services

Pipeline

Grading

Paving

Concrete

Mechanical

Contact Information

Corporate Office:

2810 Harbor Bay Parkway

Alameda, CA 94502

Phone: 510-632-7676

Oakland Regional Office

9009 Railroad Avenue

Oakland,  CA 94603

Phone: 510-632-7676

Sacramento Regional Office

1016 North Market Blvd. Ste 20

Sacramento, CA 95834

Phone: 916-372-8910

© Copyright 2017 McGuire and Hester