Donner Pass Tunnel Clearance

APWA Project of the year

union pacific railroad

$12.4  MM

McGuire and Hester was chosen by Union Pacific Railroad Project to work on this complex project that consisted of rehabilitation of 14 existing tunnels. Work included the following:  Ceilings were stabilized by the utilization of rock bolts and shotcrete.  Tunnel clearances were increased primarily by using a railcar mounted grinding machine which ground the existing granite rock ceilings to acceptable limits to allow double stacked rail car clearance.  Several tunnels also used controlled blasting methods to achieve the designed tunnel clearances.  The longest of the tunnels was over 10,000 lf.  Approximately 2,500 lf of track realignment was constructed in one tunnel to achieve sidewall clearances.

 

"Included in this project was considerable of ditching required in the tunnels between the end of ties and the wall of the tunnel. This served 2 purposes one was drainage and the other was to assist the track construction crews to line track to its proper location. McGuire & Hester performed safely, very efficient, and professionally in the use of their "HyTracker" which did the ditching inside these tunnels. It was the right machine to use in such tight working conditions."

 

-Ken Bobert

Mgr. Special Projects

UPRR Civil Construction

 

Services

Concrete

Contact Information

Corporate Office:

2810 Harbor Bay Parkway

Alameda, CA 94502

Phone: 510-632-7676

Oakland Regional Office

9009 Railroad Avenue

Oakland,  CA 94603

Phone: 510-632-7676

Sacramento Regional Office

1016 North Market Blvd. Ste 20

Sacramento, CA 95834

Phone: 916-372-8910

© Copyright 2017 McGuire and Hester