Central Plant Utilities Extention

UC Davis medical center

$5.9  MM

When UC Davis was preparing to break ground on the UC Davis Institute for Regenerative Cures, a 92,000 square-foot, $62 million stem cell research facility, they turned to McGuire and Hester for assistance. Our contract entailed the installation of water, electrical and telecommunications utilities for the new facility, which is being developed within an existing building that was previously part of the California State Fairgrounds. Our project consisted of 5,700 lineal feet of pre-insulated heated and chilled water return and supply pipelines as well as normal power, emergency power, communication lines and telephone duct banks. The biggest challenge on this job proved to be digging the 50’ wide trench shown in the design drawings within the actual space allotted to perform the work. After analyzing various trenching methods, we were able to eliminate almost all of the export – a strategy that enabled us to bring the job in within budget while providing more working space for our team.

Services

Pipelines

Grading

Paving

Concrete

Mechanical

Contact Information

Corporate Office:

2810 Harbor Bay Parkway

Alameda, CA 94502

Phone: 510-632-7676

Oakland Regional Office

9009 Railroad Avenue

Oakland,  CA 94603

Phone: 510-632-7676

Sacramento Regional Office

1016 North Market Blvd. Ste 20

Sacramento, CA 95834

Phone: 916-372-8910

© Copyright 2017 McGuire and Hester